On June 19, 2018, JSC “High-Speed Rail Lines” will hold a meeting of HSR Expert Board Presidium with the participation of the Working Group “Power Supply” of the HSR Expert Board for justification of the accepted principle technical and technological design solutions for subsystems of infrastructure “Railway Power Supply”. The meeting is planned to be held as a part of the program for realization of the “Moscow-Kazan” HSR project.
The following topics will be discussed at the meeting:
1) Design solutions for the infrastructure subsystems “Railway Power Supply” of “Moscow-Kazan” HSR;
2) Design experience and construction technology for the infrastructure subsystem “Railway Power Supply” of the Chinese HSR;
3) Expertise of the infrastructure subsystem “Railway Power Supply” of “Moscow-Kazan” HSR and its scientific and technical support.